Shrewsbury, NJ and the towns around it
Fences set straight, and built to stay that way.
Cedar, vinyl and aluminum fences and gates, with every post set in concrete below the frost line and every line pulled tight.
- 19Years in business
- 2,400+Fences installed
- 4.9From 81 Google reviews
- 8Towns served
Every kind of fence, installed by our own crew.
Privacy, pool code, a picket out front or a gate that finally closes right. We measure, pull the permit and build it ourselves.

Cedar fences
Privacy, shadowbox and picket fences in western red cedar, built board by board on site rather than from panels.
Price a cedar fence
Vinyl privacy
Heavy-wall vinyl with aluminum-reinforced rails and gates that will not sag, in white, tan or gray.
Price a vinyl fence
Aluminum and pool fence
Powder-coated aluminum that meets New Jersey pool code, with self-closing, self-latching gates.
Ask about pool fence
Gates
Walk gates and double drive gates framed in steel, hung on heavy hinges and set so they swing level for years.
Ask about gates
Chain link
Black or green vinyl-coated chain link for dog runs, back lot lines and anywhere you want a fence that disappears.
Price chain link
Repairs
Leaning posts reset, storm-damaged sections replaced and sagging gates rehung, matched to the fence you have.
Get a repair quote
A fence is only as good as its posts.
Picket & Post Fence Co. has worked out of Shrewsbury since 2007. Every post we set goes thirty-six inches down in concrete, below the frost line, and is plumbed on two sides before the concrete goes in.
We handle the survey check, the town permit and the utility mark-out, so the fence goes where it is allowed to go the first time.
- Posts set 36 inches deep in concrete
- Permit and utility mark-out handled for you
- Our own crew, no subcontractors
How a fence goes in.
Four clear steps, so you always know what happens next and when.
Measure the line
We walk the property line with you, measure every run and talk through height, style and where the gates go.
Quote and permit
A written price per run and per gate. Once you approve it we file the permit and call in the utility mark-out.
Set the posts
Holes dug to depth, posts set in concrete and plumbed, then left to cure before any rails go on.
Hang and walk
Rails, boards and gates go on, hardware is adjusted, and we walk the whole line with you before final payment.
Before & after.
Drag the handle across the photo to compare the yard with the old fence and with the new one.
BeforeAfter
Side yard, Shrewsbury: a leaning stockade fence replaced with six-foot cedar board-on-board on new posts
Recent work.
A few of the fences we have built around Shrewsbury, Red Bank, Little Silver and Tinton Falls.
What neighbors are saying.
Our old fence leaned after every winter. This one has been through three and you could still set a level on it.
They handled the permit and the pool inspection. We passed the first time and the gates close on their own, every time.
A storm took out forty feet of our cedar fence. They matched the boards and you have to look hard to find the repair.
Get in touch.
Tell us about the fence you have in mind and we will set up a time to measure. Quotes are free and come in writing.
- Call or text(732) 555-0153
- Based inShrewsbury, NJ
- HoursMon to Sat, 7am to 5pm
Request a free quote
Start with the property address. It takes about a minute.
Request received
Thanks. We will call you within one business day to set up a time to measure.



